
Scratches on expensive acrylic laminates, patchy rushed paint, and unfinished edge bands.
Cross-light laminate scans, micro-finishing checks, paint flashing and edge-band audits, with photographed evidence.
Don't let your dream home become a construction nightmare. CheckmyInteriors.com gives you a senior field expert, 500+ checks, and a clear answer before you release the final payment.

Homeowners spend lakhs, wait months, and receive an “almost done” home while the contractor promises the final 1% will be fixed later. After final payment, they face endless WhatsApp follow-ups, calls, delayed move-in, and unclear ownership.
Why it happens: Near handover, the main team moves to the next site, local labour handles final assembly, quality control drops, and the homeowner becomes the default tester.

Cross-light laminate scans, micro-finishing checks, paint flashing and edge-band audits, with photographed evidence.

Digital shutter leveling, hardware load tests, and functional operation checks.

Electrical circuit testing, plumbing and leak checks, and seal/joint verification.
CheckmyInteriors.com does not design, execute, take sides, or accept commissions. We provide a Zero-Pending Handover Audit and a photographed, prioritised snag report before you release your final payment.
Your contractor has a handover checklist. You need an independent set of eyes. From material verification to the last door alignment, we inspect what is visible, test what is not, and document what needs fixing while you still have leverage.

Send the floor plan, scope, and a few details about the project. We build a room-by-room route before we arrive.

For around three focused hours, we inspect materials, alignment, hardware, joinery, finish and function — not just what photographs well.

Receive a photo-backed report with locations, priorities and practical next steps. Use it at handover, not six months later.
Our audit is designed around the way a real home is used: opened, touched, cleaned, lived in and maintained. Every finding earns its place with evidence.

Right-side gap varies from 2mm to 6mm across the run. Adjust before final polish; uneven reveals will become more visible under task lighting.
Illustrative sample: mid-level condition, elevated handover risk. HOLD — critical safety and major functional defects need correction and reinspection.
Not a vague “looks good”. Your audit report names the room, the issue, the priority and the next action — with photographs that make the conversation straightforward.
Open sample reportBase prices for 2BHK and 3BHK homes, with scope add-ons priced openly. There is no referral commission hiding inside the number.
The complete independent audit for a typical 2 or 3 bedroom home.
A complete audit with guided contractor close-out, handover preparation, and one follow-up review so the final 1% does not become a long-term headache.
Tell us where your home is in the process. We will reply with availability, a precise quote, and what to prepare for the visit.